Toilets for customer use
Retail-CI-v4 WEc1:Indoor water use reductionposted by Karen Elliott on
We have a small retail unit with no toilet access for customers.
Free waste heat
CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.
Car wash in parking garage
EBOM-2009 WEc1:Water Performance Measurementposted by Rasita Masalskyte on
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.
Ireland Climate Zone
NC-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi all, Could anyone clarify if Ireland is in climate zone 5A or 5C? Thanks in advance
Is it ok to take out charge for changing facilities?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Maria Glädt on
Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
LEED v3 Campus Deadline
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.