Rainwater Harvesting for Toilet Flushing

NC-v4 WEp2:Indoor water use reduction
posted by  Patrice McVeigh  on 

Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?

1
Thu Jun 2, 2016, 7:24 am

Transients, visitors and peak visitors

NC-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).

1
Mon Nov 28, 2016, 7:48 pm

Understanding LEED Online V4?

General forums
posted by  Susannah Goddard  on 

Hi, Wondered if anyone can point me in the direction of any useful guidance which helps explain what is what on the new LEED Online?

0

Toilets for customer use

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Karen Elliott  on 

We have a small retail unit with no toilet access for customers.

1
Wed Jan 18, 2017, 4:23 pm

Free waste heat

CS-v4 EAp2:Minimum energy performance
posted by  sergio arus  on 

Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.

1
Wed Aug 31, 2016, 3:04 pm

Process temperature controlled space

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Karen Elliott  on 

Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.

1
Sat Jan 7, 2017, 11:08 pm

Car wash in parking garage

EBOM-2009 WEc1:Water Performance Measurement
posted by  Rasita Masalskyte  on 

Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.

1
Tue Aug 29, 2017, 6:13 pm

Ireland Climate Zone

NC-v4 EAp2:Minimum energy performance
posted by  James Duggan  on 

Hi all, Could anyone clarify if Ireland is in climate zone 5A or 5C? Thanks in advance

1
Thu Jul 20, 2017, 2:08 pm

Is it ok to take out charge for changing facilities?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Maria Glädt  on 

Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.

1
Wed May 20, 2015, 4:44 pm

Cycle lane between project and Bicycle Network

NC-v4 LTc6:Bicycle facilities
posted by  Alicia Costas Freire  on 

Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be

0