CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.
Typical TSS measures from Sedum roofing
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Andreas Soederberg on
We are planning to have Sedum Roofing, partly to recieve credit 6.1. I have read a lot about vegetated roofing also to pursue credit 6.2.
>10% exemption possible?
EBOM-2009 MPR2:Must be a complete, permanent building or spaceposted by Rasita Masalskyte on
Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
Is it ok to take out charge for changing facilities?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Maria Glädt on
Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
LEED v3 Campus Deadline
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.