Overnight apartments

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Sara Johansson  on 

Hi! My Project has space types office, apartments (with residents) and overnight apartments (rented by the office tenant for office guests).

1
Tue Dec 1, 2015, 10:19 pm

Separating waste - reuse at household

CI-2009 MRc2:Construction Waste Management
posted by  Maria Glädt  on 

We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.

1
Thu Apr 7, 2016, 7:28 pm

A shared storm water tank with other projects

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Francesco Allaix  on 

I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.

1
Thu Jan 19, 2017, 5:52 pm

Steel lockers BIFMA testing

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Anna Korinkova  on 

We have steel lockers on our project which shall be produced by a steel company and painted in the factory. They claim to use low VOC or zero VOC paints.

1
Tue Oct 18, 2016, 3:52 pm

PPA as renewable energy production?

CS-v4 EAc5:Renewable energy production
posted by  Lai-San wong  on 

Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.

1
Mon Aug 28, 2017, 1:41 pm

Switching between Options 1 and 2

CI-v4 EAc2:Optimize energy performance
posted by  Meike Borchers  on 

We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.

0

Discrepancy between credit requirements and credit specifics

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  Jody Lee Potvin-Jones  on 

I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro

1
Wed Apr 13, 2016, 9:14 pm

Water Use Reduction Calculator

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.

1
Fri Nov 27, 2015, 7:21 pm

Paints or sealants applied before building is sealed

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Patrice McVeigh  on 

Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?

1
Fri Apr 22, 2016, 9:42 pm

Open Space: Fence

NC-v4 SSc3:Open space
posted by  Sophie Brauer  on 

Hello, I'm trying to assess how much of our project site qualifies as open space.

1
Mon May 2, 2016, 3:49 pm