Non-default shower use
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project.
EPDs used in CS project, can be accounted for in CI project?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Sara Johansson on
If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification?
Prefinished wood flooring: alternative to emissions testing?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sue Clark on
We are specifying an FSC-certified wood floor that has a white pigmented wax finish.
Pilot - option 1 - EPD
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Overnight apartments
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Sara Johansson on
Hi! My Project has space types office, apartments (with residents) and overnight apartments (rented by the office tenant for office guests).
Separating waste - reuse at household
CI-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Increased ventilation instead of alarms?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maria Porter on
I understand that for densely occupied spaces an alarm (visible or audible) is required.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?
Peak building users (FTE + Peak Transients)
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sara Johansson on
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?