Forum quick links
B.U.G. determination
NC-v4 SSc6:Light pollution reductionposted by Francesco Passerini on
Hello, I remember a tool online for the determination of the BUG indexes. The upload of the photometric curves was necessary. I am no more able to find that. Is that no more available?
Possibility of unconditioned regularly occupied space
NC-v4 EAp2:Minimum energy performanceposted by Alessandro Zuanon on
Hello,
Short-term bicycle storage
NC-v4.1 LTc6:Bicycle Facilitiesposted by Maria Gamero on
Hi,
In the office building where the occupants stay for 8 hours a day, is it necessary to have a short-term parking lot for bicycles? Or does it already work with the long-term parking?
Fine or bulky material
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to specify the lighting power density according to table 9.6.1, what is the definition of "Fine material storage"?
Designing with Nature - Wooden indoor vertical finishes
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by ANTONIO CERECEDA on
Is it acceptable to use low-emission printers without providing doors for copy rooms?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Elisa Somma on
It’s about Option 1, Mechanically ventilated spaces, B. interior cross-contamination prevention.
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Certification Process
posted by Luisa Scambia on
Hello LEEDUsers,
Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
Certification time
NC-v4 IPc1:Integrative processposted by Helena Garcia on
Hi everyone,
Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?
Thank you in advance.