NC-v4 EAp3:Building-level energy meteringposted by Danilo Ilic on
What constitutes "Confirmation of permanently instaled meters" in the required documentation part?
Toilets: private or public?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In a office building that is occupied by a private firm how shall be considered the toilets according to Table 6.4 of ASHRAE 62.1-2010? Private, since the property is private? Does it depend on the
Land with agricultural use considered previously disturbed
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Certifying a new airport terminal using LEED - exclude the runways?
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
One of our clients is considering the possibility of certifying a new airport terminal using LEED and asked us to perform a preliminary evaluation of the potential LEED score.
Baseline systems modeling requirements
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello!
I'm having some doubts regarding how to model the baseline (BB) building.
When modelling a baseline system (system #5 - VAV):
1) -
District plus heat pump
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
I have a building composed of two parts: a warehouse and an office.
Diferent product references of one of several brands in same EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ricardo Sá on
Hi All,
According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.
Kitchen faucet for restaurant project
CI-v4 WEc1:Indoor water use reductionposted by Borja Sánchez on
Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning s
Differences between design phase and construction phase
NC-v4 MPR3:Must comply with project size requirementsposted by JORDI CASTELLANO on
hello everyone,
our project has achieved the design phase of LEED review.