Forum quick links
Option 2 - Carbon dioxide monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered.
LTc7 - Reduce parking footprint - examplary performamce
NC-v4 LTc7:Reduced parking footprintposted by Maria Peralta on
Hello!
Modeling energy savings from receptacle load within energy simulation
CI-v4 EAc2:Optimize energy performanceposted by Martina Dell'antonio on
Hi,
Hotel Composting Program
Pilot-Credits SSpc129:Comprehensive Compostingposted by Belén Valladares López on
We are going to implement a composting program in a hotel.
Pilot Credit EApc106 ISO 50002 Energy Audit
EBOM-v4 INc1:Innovationposted by David Alemany on
If this pilot credit was part of a pre-requisite or credit perhaps the advantages and disadvantages could be explained of using ISO 50002 or ASHRAE Procedures to carry out energy audits for th
Natural Ventilation in Dwelling Units | ASHRAE 62.1 - 2010 natural ventilation exceptions
NC-v4 EQp1:Minimum indoor air quality performanceposted by Aris Koliopoulos on
Dear All,
We are working on a 6 storey residential project which pursues LEED certification under the BD+C: New Construction rating system.
EBOM-v4.1 EQc2 - European equivalent
EBOM-v4.1 EQc2:Integrated Pest Managementposted by Margherita D'Alessio on
Hello everyone,
Differences between Baseline and Proposed energy model
CI-v4 EAp2:Minimum energy performanceposted by Irina Lugo on
Hi everyone, sorry if this is a bit obvious, it is my first time working with this type of LEED certification.
ventilation in Walk-in Coolers
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Hello, is ventilation in Walk-in Cooler necessary for the prerequisite? Does the request depend on the indoor setpoint temperature?
Alternative measurement to material costs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ingrid Pohl on
I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?