Forum quick links
VENTILATION WAREHOUSES
Warehouses-EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Helena Garcia on
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. The question is for the warehouse, this warehouse is not conditioned and the spa
Minimum HVAC equipment efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).
Football field
NC-2009 SSc2:Development Density and Community Connectivityposted by Instra Ingenieros on
Hi, Is correct to assume that a football field can be considered a basic service inside the category "fitness center"? Thank you in advance
French A+ VOC certification
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by LEEDme Lorenzi on
Is French A+ VOC certification accepted by EQ credit 4.3 compliance?
pressure drop adjustment System 1
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Can the pressure drop adjustment (e.g. for fully ducted return or for particulate filtration MERV) be applied to System 1?
Occupancy hours vs. Building Operating Plan
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Anna Korinkova on
My question is regarding to operating hours of the building and the Building Operating Plan (BOP).
mandatory efficiency for backup system
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Shall the mandatory efficiency of section 6.4 (Tables 6.8.1) be verified also for a chiller that works as backup system (the chilled water is provided in normal conditions by district cooling)? Be
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Wood stair
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by LEEDme Lorenzi on
Good morning, We have a wood stair (wooden steps covered with another wood species) that is manufactured by the millwork contractor. The scale is a custom made design.
Simulation. Warehouse. Fixed high racks, occupied.
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Candice Clark on
For a warehouse, can I deduct the permanently fixed high racking coverage area from the gross floor area, and focus my 75% daylight coverage on the aisles and landing spaces only? I say yes.