Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Single tenant O&M certification on a multitenant building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ricardo Sá  on 

LEED O&M 2009 reference guide stated (page xxii) that "certification applies only to whole buildings" and that "the project of a multitenant building must involve at least 90% of the total gros

1
Thu May 26, 2016, 6:34 pm

VENTILATION WAREHOUSES

Warehouses-EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Helena Garcia   on 

We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. The question is for the warehouse, this warehouse is not conditioned and the spa

1
Wed Mar 8, 2017, 8:31 pm

pressure drop adjustment System 1

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Can the pressure drop adjustment (e.g. for fully ducted return or for particulate filtration MERV) be applied to System 1?

1
Mon Oct 3, 2016, 2:16 pm

Occupancy hours vs. Building Operating Plan

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Anna Korinkova  on 

My question is regarding to operating hours of the building and the Building Operating Plan (BOP).

1
Thu Apr 16, 2015, 12:45 pm

mandatory efficiency for backup system

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Shall the mandatory efficiency of section 6.4 (Tables 6.8.1) be verified also for a chiller that works as backup system (the chilled water is provided in normal conditions by district cooling)? Be

1
Fri Jul 31, 2015, 1:26 pm

Acoustic performance: reverberation time

NC-v4 EQc9:Acoustic performance
posted by  alessandro santuari  on 

Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks

1
Tue Sep 26, 2023, 2:25 pm

Wood stair

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  LEEDme Lorenzi  on 

Good morning, We have a wood stair (wooden steps covered with another wood species) that is manufactured by the millwork contractor. The scale is a custom made design.

1
Mon Jan 4, 2016, 3:53 pm

French A+ VOC certification

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  LEEDme Lorenzi  on 

Is French A+ VOC certification accepted by EQ credit 4.3 compliance?

0

LEED v4 rating systems being translated to Portuguese

General forums
posted by  Tristan Roberts  on 

USGBC is translating the LEED v4 rating systems to Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback!

0

Baseline HVAC System Type - for laboratories

NC-v4 EAp2:Minimum energy performance
posted by  Carol SR  on 

Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a

1
Wed Nov 30, 2016, 3:51 pm