opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

ROCKY SOIL

NC-v4 SSc2:Site development - protect or restore habitat
posted by  soha yamani  on 

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?

1
Mon Aug 28, 2017, 6:37 pm

Deck to Deck Partition

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Omar Elrawy  on 

Dear all, I have a gypsum board partitions with a false ceiling all over the floor.

1
Tue Feb 24, 2015, 9:59 pm

Zero Lot Line

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Omar Elrawy  on 

Dear all, I have a project with an underground parking within the whole LEED project boundary, and landscape work above the underground parking, all around the above-grade building. Du

1
Fri Feb 9, 2018, 4:25 am

Residential Core & Shell

LEED Rating System Selection
posted by  soha yamani  on 

Hello all I am working on a project that consists of 12 residential buildings with 3 prototypes each prototype has 4 identical residential buildings ( 5 stories each) however the owner will comp

1
Thu Feb 2, 2017, 3:30 pm

LEED EBOM Eligibility

EBOM-2009 PIf1:Minimum Program Requirements
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Wed Dec 30, 2015, 5:38 pm

municipality irrigation line

CS-v4 WEc1:Outdoor water use reduction
posted by  Radwa Amin  on 

the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you

1
Tue Oct 15, 2019, 7:26 am

Basement That Extends to Plot line

NC-2009 WEc1:Water Efficient Landscaping
posted by  Omar Elrawy  on 

Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.

1
Fri Mar 11, 2016, 9:49 am

Polishing Powder

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Omar Elrawy  on 

Dear all, I have a polishing powder that is intended to be used for polishing marble surface.

1
Wed Jan 14, 2015, 2:06 am