NC-2009 SSp1:Construction Activity Pollution Preventionposted by Omar Elrawy on
Dear all, I have a project with an underground parking within the whole LEED project boundary, and landscape work above the underground parking, all around the above-grade building. Du
Residential Core & Shell
posted by soha yamani on
Hello all I am working on a project that consists of 12 residential buildings with 3 prototypes each prototype has 4 identical residential buildings ( 5 stories each) however the owner will comp
LEED EBOM Eligibility
EBOM-2009 PIf1:Minimum Program Requirementsposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
municipality irrigation line
CS-v4 WEc1:Outdoor water use reductionposted by Radwa Amin on
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
Polishing Powder
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Omar Elrawy on
Dear all, I have a polishing powder that is intended to be used for polishing marble surface.
SRI Value for concerete
NC-2009 SSc7.2:Heat Island Effect—Roofposted by soha yamani on
Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part
Trucks
NC-v4 LTc7:Reduced parking footprintposted by Tarek on
In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).