Forum quick links
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Certificate timeline
ND-Plan-v4 GIBc1:Certified green buildingsposted by soha yamani on
I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your neigh
Covered bicycle racks for dormitories building in a university
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by soha yamani on
I am working on a university campus project which includes over twelve buildings and a dormitories building, now regarding SSC4.2 credit we have provided the required number of bicycle racks for ea
Platted Lots by Government
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?
VOC product category
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by soha yamani on
we are trying to identify a product to check its VOC limit, however, the supplier identified the product as Prefabricated Architectural Multi- Component and touch up from RULE 1107.
Signed Contract with the CxA
NC-2009 EAc3:Enhanced Commissioningposted by Mohamed M. Abd Elhameed on
We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt.
Maximum Temperature
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Omar Elrawy on
Dear All, I need to ensure that in the 60/60 rule, I do not find anything about the maximum indoor temperature during flush-out, please advice if I can maintain any indoor temperature as long as it
Hard-Lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Omar Elrawy on
Dear all, I need to know exactly what fulfills the "Hard-lid" ceiling?.
No New Wood
NC-2009 MRc7:Certified Woodposted by Omar Elrawy on
Dear all, I actually have two questions; the first is that I have a wood product with only pre-consumer recycled content, I need just to confirm that this product is exempt from this c