cutsheets

NC-2009 MRc5:Regional Materials
posted by  Jian Hui Liu  on 

Clearly i know the project team should provide cutsheets for the materials to support regional materials claims,but i cannot get the meaning of "cutsheets".Which kind of information the cutsheets s

4
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Oct 28, 2015, 8:10 am

VRF System Rc Value

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  SAMY Chamy  on 

we use VRF system for A/c we use value given in LEED guide Rc 2.2 lb/ton As per the the default calculation we get points but the reviewer tells Rc for VRF is very low it may be "3 - 6" lb/ton

3
Thu Sep 3, 2015, 7:12 am

n/a

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Leanne Niu  on 

I am dealing with a complex commercial center containing a indoor ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.

2
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Sat Aug 1, 2015, 12:28 pm

If the ventilation of kitchens in hotel should be included in

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Leanne Niu  on 

A hotel project that the kitchens have independent ventilation and outdoor air system , whether the ventilation of kitchens should be included in the calculation?

2
Tue Apr 28, 2015, 1:28 am

DES for school campus

CS-2009 EAp2:Minimum Energy Performance
posted by  Shenhao Li  on 

Dear all, We have a school campus project (LEED NC MB) in Shanghai. The cooling source is from central cooling plant and the heating source is from Municipal steam.

5
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Wed Mar 18, 2015, 2:13 pm

where to download?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Weidong Luo  on 

When working on leedonline for this credit, we are told to Download, complete and upload the Supplemental Daylight and Views Calculation Spreadsheet (found under "Credit Resources"). The problem is

2
Default Avatar
Ecotech International
LEEDuser Basic Member
0 thumbs up
Sat Feb 14, 2015, 1:11 am

Complex occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  study topenergy  on 

There is a data center with a complex occupancy (2 shifts). Day shift is 9 hours, 8:30-17:30; night shift is 15 hours, 17:30-8:30. There are 3 persons per shift.

2
Wed Feb 4, 2015, 6:34 am

Can Ice rink and Ski centre be excluded

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Leanne Niu  on 

Recently, i am working for a complex commercial project including a ice rink and a ski centre. These two spaces are acturally very special, whether we can exclude them when we consider thermal comf

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Fri Dec 12, 2014, 8:05 pm

Evaporative Chiller in EAp2?

NC-2009 EAp2:Minimum Energy Performance
posted by  Yastimy Jupson  on 

Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Dec 10, 2014, 3:09 pm

LEED v4 rating systems being translated to Chinese

General forums
posted by  Tristan Roberts  on 

USGBC is translating the LEED v4 rating systems to Mandarin Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback!

2
Wed Oct 22, 2014, 3:05 am