one product both meet two criteria in option2.
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on
Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.
What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Some questions about temporary parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Jianzhushe Lili's on
Dear all:
Improving thermal comfort for ski center and ice rink
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Chen Jin on
I am dealing with a complex commercial center that contains a ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.
Green Power - Carbon Offset
CI-2009 EAc4:Green Powerposted by Henry Mak on
Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum Energy Performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.
How to calculate Squatter Toilet in we p1? and roof garden?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Shenhao Li on
HI, i have 2 questions to ask: 1.Now i have a hotel project in china. In this project, Several squatter toilets(with water tank) are designed and will be constructed in the future.
Energy rate of DES Energy simulation
NC-2009 EAc1:Optimize Energy Performanceposted by Renaud Gay on
Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.