EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.
Energy Star Related Product
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
parking area under cover
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by ANNA SUN on
my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area.
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.
WEp1 and c1: Indoor Water Use Reduction
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
Hi! We understand that all newly installed water fixtures must be WaterSense labeled.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
unfinished space simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
Data Center Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.