Forum quick links
Licensed Professional
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.
Energy Star Related Product
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
parking area under cover
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by ANNA SUN on
my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area.
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.
WEp1 and c1: Indoor Water Use Reduction
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
Hi! We understand that all newly installed water fixtures must be WaterSense labeled.
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
unfinished space simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
Data Center Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.