Forum quick links
Bioretention
NC-v4 SSc4:Rainwater managementposted by Himanshu Agarwal on
Dear All, In my project, we are using two plants, namely, Vernonia elaeagnifolia, Bougainvillea species. I just wanted to know weather they have bioretention facility or not?
Choosing between LEED CS and EB for commercial building in India
posted by Pushkala R on
HI, I am trying to apply for LEED certification as per LEED v3 2009 in India. My project profile is as follows: 1. It an existing building that has been in use for over a decade. 2.
treat wastewater to teriary standards?
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Heat Island Reduction
EBOM-v4 SSc3:Heat island reductionposted by VISHESH AGARWAL on
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2
Green pavers
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
prescriptive efficiency requirements ABCPG section 2.9
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Rahul Yadav on
Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
EA Prerequisite 2
CI-2009 EAp2:Minimum Energy Performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con