Forum quick links
Pick up and Drop Facility
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Priyadarsi Das on
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.
Enhanced Refrigerant Management
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by VISHESH AGARWAL on
if actual Rc (lb/ton) of the chiller and other refrigerant units are unknown then will i able to take default.
Calculating stored rainwater available
NC-2009 WEc3:Water Use Reductionposted by Yusuf Turab on
We are having some trouble coming up with the calculation for rainwater stored and reused annually.
Calculating Average Density: Residential Areas or Neighborhood
CI-2009 SSc2:Development Density and Community Connectivityposted by Ajay Kumar on
For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a
Green Product- FSC
EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
Project space Owned & Leased partly
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Nandana Kumar on
Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
Are changing rooms compulsory now as per revised credit form
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Priyadarsi Das on
In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.
How to get the benefit of automatic shading control device
NC-2009 EAc1:Optimize Energy Performanceposted by Yusuf Turab on
We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take