Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Pick up and Drop Facility

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Priyadarsi Das  on 

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.

0

Enhanced Refrigerant Management

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  VISHESH AGARWAL  on 

if actual Rc (lb/ton) of the chiller and other refrigerant units are unknown then will i able to take default.

1
Fri May 6, 2016, 6:30 pm

Calculating stored rainwater available

NC-2009 WEc3:Water Use Reduction
posted by  Yusuf Turab  on 

We are having some trouble coming up with the calculation for rainwater stored and reused annually.

0

Calculating Average Density: Residential Areas or Neighborhood

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Ajay Kumar  on 

For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a

1
Mon Nov 21, 2016, 2:48 pm

Green Product- FSC

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.

1
Thu Aug 25, 2016, 2:39 pm

SS - EM

NC-2009 EAc1:Optimize Energy Performance
posted by  SSN Energy Model  on 

Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.

1
Sun Feb 19, 2017, 5:24 pm

Project space Owned & Leased partly

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Nandana Kumar  on 

Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).

1
Sat Aug 26, 2017, 10:36 pm

LIFT Lobbies to be included in VRP Calculations

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Preethi Ranjith  on 

i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.

0

Are changing rooms compulsory now as per revised credit form

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Priyadarsi Das  on 

In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.

1
Wed Jan 18, 2017, 2:31 pm

How to get the benefit of automatic shading control device

NC-2009 EAc1:Optimize Energy Performance
posted by  Yusuf Turab  on 

We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take

1
Fri Jul 1, 2016, 2:14 pm