Forum quick links
Building Flush out for naturally ventilated building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by PRATIK KUMAR on
Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?
Long Term Service Contract
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Erin Holdenried on
Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the GBCI reviewer?
Pick up and Drop Facility
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Priyadarsi Das on
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.
Enhanced Refrigerant Management
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by VISHESH AGARWAL on
if actual Rc (lb/ton) of the chiller and other refrigerant units are unknown then will i able to take default.
Calculating stored rainwater available
NC-2009 WEc3:Water Use Reductionposted by Yusuf Turab on
We are having some trouble coming up with the calculation for rainwater stored and reused annually.
Calculating Average Density: Residential Areas or Neighborhood
CI-2009 SSc2:Development Density and Community Connectivityposted by Ajay Kumar on
For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.