Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

EBOM V4- IPM

Hospitality-EBOM-v4 EQc9:Integrated pest management
posted by  VISHESH AGARWAL  on 

For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.

1
Tue Jan 17, 2017, 8:43 pm

Tenant agreement to exclude PFP boxes

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.

1
Tue Feb 17, 2015, 5:13 pm

LEED Boundary

NC-2009 IEQp1:Minimum IAQ Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.

1
Fri Nov 6, 2015, 1:22 pm

Building Flush out for naturally ventilated building

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  PRATIK KUMAR  on 

Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.

1
Wed Mar 16, 2016, 2:11 am

Calculating stored rainwater available

NC-2009 WEc3:Water Use Reduction
posted by  Yusuf Turab  on 

We are having some trouble coming up with the calculation for rainwater stored and reused annually.

0

Calculating Average Density: Residential Areas or Neighborhood

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Ajay Kumar  on 

For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a

1
Mon Nov 21, 2016, 2:48 pm

Changed awarded credit to attempted

LEED Rating System Selection
posted by  Prudhvi Mahadev  on 

I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?

1
Sat Aug 26, 2017, 7:42 pm

Long Term Service Contract

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Erin Holdenried  on 

Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the GBCI reviewer?

0

Pick up and Drop Facility

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Priyadarsi Das  on 

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.

0

Enhanced Refrigerant Management

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  VISHESH AGARWAL  on 

if actual Rc (lb/ton) of the chiller and other refrigerant units are unknown then will i able to take default.

1
Fri May 6, 2016, 6:30 pm