Green Product- FSC

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.

1
Thu Aug 25, 2016, 2:39 pm

SS - EM

NC-2009 EAc1:Optimize Energy Performance
posted by  SSN Energy Model  on 

Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.

1
Sun Feb 19, 2017, 5:24 pm

LIFT Lobbies to be included in VRP Calculations

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Preethi Ranjith  on 

i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.

0

Are changing rooms compulsory now as per revised credit form

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Priyadarsi Das  on 

In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.

1
Wed Jan 18, 2017, 2:31 pm

How to get the benefit of automatic shading control device

NC-2009 EAc1:Optimize Energy Performance
posted by  Yusuf Turab  on 

We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take

1
Fri Jul 1, 2016, 2:14 pm

Lighting Control

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  VISHESH AGARWAL  on 

I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.

1
Thu Oct 6, 2016, 4:23 pm

Project space Owned & Leased partly

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Nandana Kumar  on 

Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).

1
Sat Aug 26, 2017, 10:36 pm

VRV Units Prescriptive Compliance in LEED CI 2009

CI-2009 EAp2:Minimum Energy Performance
posted by  Himanshu Dehra  on 

The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16).

1
Wed Jun 17, 2015, 7:49 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am

Innovation Credit for Employee Wellness

NC-2009 IDc1:Innovation in Design
posted by  sriram tetali  on 

Hi, Can anyone has guidelines or suggest for attempting of Innovation in Design credit for Employee Wellness Can it be achieved? or suggest any other alternative. Regards SRIRAM

1
Tue Dec 20, 2016, 7:01 pm