Modeling DCV Savings for Proposed Building

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Bernard Sagaiyaraj  on 

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel

1
Fri Jan 27, 2017, 6:50 pm

ESVE Requirement

Pilot-Credits LTpc70:Green vehicles
posted by  Joshua Chia  on 

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on

0

Accidentally Opened Awarded Credit during Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Bernard Sagaiyaraj  on 

My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.

1
Tue Aug 25, 2015, 1:06 pm

International Project - Case 2 Option 1 or Option 2

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Sheena Moses  on 

Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.

1
Tue Aug 29, 2017, 6:19 pm

International Project - Case 2 Option 1 or Option 2

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Sheena Moses  on 

Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.

1
Tue Aug 29, 2017, 3:32 pm

Table PIf3-1 Space Usage Type - Owned vs Leased

NC-2009 PIf3:Occupant and Usage Data
posted by  Terrapin BrightGreen  on 

Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage?

1
Mon Jan 16, 2017, 2:11 pm

Building Flush Out Inquiry

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Sheena Moses  on 

We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.

1
Tue Aug 29, 2017, 4:01 pm

Natural ventilation for residential

CS-2009 IEQp1:Minimum IAQ Performance
posted by  mai elly  on 

HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.

1
Thu Dec 10, 2015, 3:01 pm

Required parking lots and LEED boundary Calculations

CS-2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking

0

ACP for Certified Wood vs Pilot for Legal Wood

General forums
posted by  Terrapin BrightGreen  on 

The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/

1
Thu May 4, 2017, 3:36 pm