Forum quick links
Natural ventilation for residential
CS-2009 IEQp1:Minimum IAQ Performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Required parking lots and LEED boundary Calculations
CS-2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking
HVAC System 8 Baseline
CS-2009 EAp2:Minimum Energy Performanceposted by CINDY CHAI on
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.
Mechanical Ventilation using local code
NC-2009 IEQp1:Minimum IAQ Performanceposted by MOHD HAFIZI MOHAMAD on
Hi. Is it a compulsory to design mechanical ventilation by using local code even if ASHRAE Standard is more stringent in order to score IEQ Credit 2: Increased Ventilation? I got a problem to sco