Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Fresh air supply using Cooling pad in Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SAMY Chamy  on 

Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p

1
Mon Mar 14, 2016, 1:11 pm

V3 project Minimum Indoor Air Quality Performance Pre-requisite.

CI-2009 IEQp1:Minimum IAQ Performance
posted by  sajjad Malik  on 

I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option

1
Thu Jul 20, 2017, 5:28 pm

Project boundary issues

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Muneeb Haider  on 

I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site.

0

Documents Required For pre-certification for LEED V4 Core Shell

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Aqrab Ali Rana  on 

I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an

1
Fri Nov 4, 2016, 3:25 pm

Is APPENDIX Needed

NC-2009 IEQp1:Minimum IAQ Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi

0

Modeling Software Changing

NC-2009 EAp2:Minimum Energy Performance
posted by  Muzamil Rafique  on 

Hello Marcus, I have question regarding the energy simulation software.

1
Tue Jul 19, 2016, 3:34 pm

Regularly Occupied Spaces

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Muzammal Abbas LEED AP (BD+C)  on 

I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular

1
Fri Oct 28, 2016, 2:59 pm

office building

Retail-NC-v4 WEc4:Water metering
posted by  Zahid Ahmed  on 

recently appointed as FM in commercial office building. what to do if we want to go for LEED certification. need details. thank you

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Aug 17, 2017, 11:17 am