New application for a campus
posted by Hafidh Alsamarrai on
Hello,
I am just starting a new application for a campus project and I have had no previous experience with LEED.
HVAC Baseline System 8 - with Purchased Chilled Water only
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.
How "Uber" can serve the quality transit?
NC-v4 LTc5:Access to quality transitposted by Ahmed Abunada on
Hello,
LED lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Karim Farah on
The LEED guideline states that “Mercury-free lamps, such as LEDs, can be included in the pictogram per lumen-hour calculations only if their energy efficiency levels are equal to or greater than th
Non SRI compliant material over Excellent SRI material
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Faisal on
What if a roof slab which is covered with an assembly having excellent SRI(>78) & U V values as per Energy modeling requirement, is covered with an non-compliant material (say grey gra
design case water calculation
NC-v4 WEc2:Indoor water use reductionposted by Azaz Ansari on
why is the no information required to enter in design water calculation to accomodate visitors?
Please note we have visitor column in calculation sheet.
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
modeling with air cooled chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage + dive