Forum quick links
Acceptable thermal conditions in naturally conditioned spaces
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Panupant Phapant on
There is a cafeteria where the HVAC designer of record intends to have it naturally conditioned.
LEED CI 2009 _ MR Cr1.1_Tenant Space- Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Kusha Dogra Sehgal on
I am currently working on LEED CI 2009 project.
Fan power in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
Duct sealing methods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Glass Doors
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by John Covello on
Hello, Do Glass Doors count as windows and require automatic glare control?
Ice machines
NC-v4 WEc4:Water meteringposted by John Covello on
Hello. Are Ice Machines considered process water for the purposes of this credit? If they are connected to a freezer does that count?
LPD for manufacturing space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.