Museum Building / Gallery Areas
NC-v4 EQc9:Acoustic performanceposted by O Moltay on
Hi, we have a museum project with general exhibition areas: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide?
Technical service building - Healthcare v2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Landry on
Hello fellow LEED experts, my client is confused on wether or not their services buildings has to be include in the current certification or could be certificated separately.
ventilation flow rate
CI-2009 IEQc2:Increased Ventlilationposted by ilkyaz ceren güçlü on
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?
How can I develop leed certificate service in my country?
NC-v4 EQp1:Minimum indoor air quality performanceposted by erdem özkan on
We provide Leed certificate and green building service but how are we developing this process in Turkey?
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
International Project Epa CGP
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ESRA OZKONUKSEVER on
Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?