Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Museum Building / Gallery Areas

NC-v4 EQc9:Acoustic performance
posted by  O Moltay  on 

Hi, we have a museum project with general exhibition areas: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide?

1
Thu Feb 15, 2018, 10:42 pm

the documentation language

NC-2009 SSc1:Site Selection
posted by  ESRA OZKONUKSEVER  on 

hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.

1
Thu Jun 25, 2015, 8:39 pm

Natural Ventilation Loads Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Sefa Sahin  on 

Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.

1
Fri Apr 21, 2017, 2:15 pm

Proposed case outside airflow rates

NC-2009 EAp2:Minimum Energy Performance
posted by  Cagril Comert  on 

Hi, Our office building is ventilated with a constant volume AHU and conditioned by VRF system. AHU supplies 100% fresh air to the spaces, while VRF system provides heating and cooling.

1
Tue Jul 11, 2017, 3:54 pm

Technical service building - Healthcare v2009

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jonathan Landry  on 

Hello fellow LEED experts, my client is confused on wether or not their services buildings has to be include in the current certification or could be certificated separately.

1
Mon Jan 23, 2017, 7:14 pm

ventilation flow rate

CI-2009 IEQc2:Increased Ventlilation
posted by  ilkyaz ceren güçlü  on 

Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?

0

How can I develop leed certificate service in my country?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  erdem özkan  on 

We provide Leed certificate and green building service but how are we developing this process in Turkey?

0

CSRs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  NESLIHAN AKSOY  on 

These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?

1
Sat May 16, 2015, 3:00 am

P: avarage rainfall event

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  ESRA OZKONUKSEVER  on 

Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w

0

Regularly Occupied Space Area Calculation

NC-2009 PIf3:Occupant and Usage Data
posted by  ESRA OZKONUKSEVER  on 

Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!

1
Fri Nov 27, 2015, 7:14 pm