How many points can be claimed if project is served with 100% Renewable Energy for EAC1?
NC-v4 EAc2:Optimize energy performanceposted by Ashraf Ali Khan Khan on
How many points can be claimed if project is served with 100% Renewable Energy?
LEED CS V4 Design of Snow park
CS-v4 EAp2:Minimum energy performanceposted by Shahana Sayed on
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE.
SSc7.2 roof gravel
CS-2009 SSc7.2:Heat Island Effect—Roofposted by S Nagarajan on
Dear Sir In a C&S LEED building, can we use coating over an existing gravel and if so whether the credit requirements will be fulfilled
Ceramic Wall base
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Neetika Parmar on
Does ceramic wall base have to be certified under Floorscore or does it automatically qualify similar to mineral based flooring tile ??
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-Site Renewable Energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
LEED Development Density and community connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Sherrin Pulickal on
What does it mean by double the project density compared with average density within a calculated area? Its the ememplary performance in option 1.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.