Forum quick links
School Building
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.
Applicable Cooling source in Propose case - LEED Group - v4 C&S
CS-2009 EAp2:Minimum Energy Performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
LEED NCv 2009 Multi-Family Residential: Apartment
NC-2009 EAp2:Minimum Energy Performanceposted by junaid naseer on
Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.
Core performance guide option
NC-2009 EAp2:Minimum Energy Performanceposted by mohammed alshaikhsalama on
Hi, The project intents to follow option 3 Perspective compliance path Advanced Building Core Performance Guide.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Shopping mall and Community Connectivity
posted by Nadia Azzam on
My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.
Arc Platform
posted by Sarfaraj Khan on
Hi Did any one know any guideline or book from USGBC to complete the project documents for LEED V4 O&M in the Arc Platform if the project is going for performance pathway
LEED AP BD+C V4 EXAM in one month!
posted by Moataz Sakkary on
Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.