Forum quick links
Requirement for mechanically-ventilated spaces and Water cooling systems in sheds
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Hanh Truong on
Dear all,
Hope you are doing well.
Parking Capacity calculation - disabled parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tiffany de Klerk on
When calculating the total parking capacity should you subtract the number of parking spaces allocated for disabled users from the total capacity and then work out the number of parkings required t
LEED V3 WEc1 V06 form Missing Resource?
NC-2009 WEc1:Water Efficient Landscapingposted by Melissa Merryweather on
We use 100% non-potable water in our project but the LEED v06 form still requires 50% reduction from baseline, but there is no calculator on the form and none separately available under Resources.
electric bicycles can comply with Green vehicles
NC-v4 LTc8:Green vehiclesposted by Hanh Truong on
Dear all,
My question is that whether electric bicycles can be considered as Green vehicles or not?
ID for Smart Home System
NC-2009 IDc1:Innovation in Designposted by Tim Middleton on
Our project is mixed use, roughly 1/3 retail, 1/3 residential and 1/3 hotel. We want to apply for Innovation for the use of Smart Home systems in the residential part.
loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
link goes to the main USGBC home page
Pilot-Credits PC14:Walkable Streetsposted by Melissa Merryweather on
Hi, I am registered for this Pilot Credit.