Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
Kitchen
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sophie Brauer on
Hello, I am having a lot of difficulty finding a (European) kitchen that qualifies for this credit.
What is legally binding language?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Pawel Krawczyk on
A copy of the lease agreement that has been provided for review states that the tenants must install CO2 sensors in all densely occupied spaces. For the review team, it is unclear how the provided
No test of SRI?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Lise Dannesboe on
Hi! We are using new light grey concrete and new light grey concrete stones on our site. LEED provides typical SRI values, f.ex.
Baseline for retail
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! I know that there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for retail?
On-site renewable energy
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! We are trying to offset as much as possible from our electricity consumption with on-site PV.