Forum quick links
Entryway system
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Elodie DUMAS on
Our project is an office building where groundfloor is componed by retails and services dedicated to unknown tenants. Taking into account that this is a CS certification, do we need to install ent
WaterSense Labelling Alternatives
CI-v4 WEp1:Indoor water use reductionposted by Oliver Bate on
Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?
Bicyle Storage in a office building
CS-v4 LTc6:Bicycle facilitiesposted by Guillaume Rose on
Hi,
Is the Case 1. commercial or institutional projects applicable for an office building ?
Insulation - option 2 budget calculation method
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, The guide is not very clear about interior or exterior insulation when we use option 2. Exterior insulation must be included in option 2 calculation for New Construction of offices ?
Parking spaces for projects logistics
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anna Korinkova on
Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.
90.1 2010: V4: Baseline Lighting Control
NC-v4 EAp2:Minimum energy performanceposted by Adrien Dumolard on
Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting
Staff resources for LEED ND Projects
ND-Plan-v4 MPR2:Must use reasonable LEED boundariesposted by Devani PERERA on
Hi,
Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?
Thanks for your help.
Regards.
Green walls
NC-v4 WEc1:Outdoor water use reductionposted by Julien Richard on
Hi, Do we have to include green walls in the calculation ?
Non occupied spaces
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Hello, Is nonoccupied spaces are affected by this credit ?
Tools and flexibility
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Devani PERERA on
There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail.