Pilot-Credits SSpc45:Site assessmentposted by Devani PERERA on
I do agree with Loic that in France, projects that pursue the french certification HQE would perform a site analysis to assess the needs, opportunities and issues that need the most attention.
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
Plastic Sheeting to Protect Raised Technical Floor
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ian McCall on
Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.
Sound transmission for moveable partitions
NC-v4 EQc9:Acoustic performanceposted by Anaïs P on
Do the requirements about sound transmission have to be applied for moveable partitions in open-plan office? Achieving the STC values from table 1 betweeen two standards offices separated by a move
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
C&S or NC ?
posted by Claire PIMET on
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
All or the Main street frontages 1:1.5
Pilot-Credits PC14:Walkable Streetsposted by Ian McCall on
Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.