Plastic Sheeting to Protect Raised Technical Floor

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ian McCall  on 

Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.

1
Thu Jan 19, 2017, 10:48 am

C&S or NC ?

LEED Rating System Selection
posted by  Claire PIMET  on 

I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.

0

Green e energy equivalency EKOenergy

CI-v4 EAc6:Green power and carbon offsets
posted by  Valentin Grimaud  on 

Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.

1
Wed Jan 18, 2017, 4:25 pm

Coffee Room Fixture Flow Rate?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ian McCall  on 

Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.

1
Wed May 13, 2015, 10:19 am

Minimum Energy Performance

NC-v4 EAp2:Minimum energy performance
posted by  Alexandra Mazzoni  on 

Hello, I have a question regarding equivalent standards : Is there an USGBC approved equivalent standard for projects located in France ? Many thanks in advance for your assistance.

1
Wed May 24, 2017, 4:09 pm

Number of sampling location

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Caroline PIN  on 

Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.

1
Thu Mar 19, 2015, 10:49 pm

All or the Main street frontages 1:1.5

Pilot-Credits PC14:Walkable Streets
posted by  Ian McCall  on 

Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.

0

Anti corrosion paint under fire retarding

NC-v4 EQc2:Low emitting materials
posted by  Elodie DUMAS  on 

Our contractor must spread an anti corrosion paint under a fire retarding flocking (on a metallic structure).

1
Mon May 9, 2016, 5:24 pm

Low-Emitting Materials Calculator

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.

1
Mon Nov 3, 2014, 5:19 pm

Tenants Obliged to Share Data with USGBC?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Ian McCall  on 

Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?

1
Mon Apr 20, 2015, 2:38 pm