Forum quick links
Plastic Sheeting to Protect Raised Technical Floor
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ian McCall on
Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.
C&S or NC ?
posted by Claire PIMET on
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Minimum Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Alexandra Mazzoni on
Hello, I have a question regarding equivalent standards : Is there an USGBC approved equivalent standard for projects located in France ? Many thanks in advance for your assistance.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
All or the Main street frontages 1:1.5
Pilot-Credits PC14:Walkable Streetsposted by Ian McCall on
Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.
Anti corrosion paint under fire retarding
NC-v4 EQc2:Low emitting materialsposted by Elodie DUMAS on
Our contractor must spread an anti corrosion paint under a fire retarding flocking (on a metallic structure).
Low-Emitting Materials Calculator
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.
Tenants Obliged to Share Data with USGBC?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ian McCall on
Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?