Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Door arrest systems or free-swinging closers allowed?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period?

1
Wed Aug 30, 2017, 2:48 pm

indoor smoking room exhaust

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Nicole Isk  on 

Hi, an occupant in our project building (office) insists on indoor smoking. He agreed to installing a cabin in his kitchenette (they already smoke there).

1
Tue Jul 7, 2015, 10:02 pm

calculation of material cost

NC-2009 MRc5:Regional Materials
posted by  Doreen Kruschina  on 

Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt

1
Mon Oct 20, 2014, 2:35 pm

Definition of street frontage

Pilot-Credits PC14:Walkable Streets
posted by  Florian Schmidtchen  on 

What is the right definition of street frontage?

0

Financial donation

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Florian Schmidtchen  on 

Dear all, As we all know it is possible to get ‘Exemplary-Performance-Points’ by double the appropriate credit requirements.

1
Wed Dec 21, 2016, 11:56 pm

Irrigation type definitions

NC-v4 WEp1:Outdoor water use reduction
posted by  Jens Apel  on 

Does anyone know if there are definitions for the different irrigation types? Especially the differences between the two drip types would be of interested. Thanks, Jens

0

certified projects

General forums
posted by  Bernadette Stauder-Buschlinger  on 

certified projects are still displayed and accessible at the new LEED Online?

1
Mon Jan 5, 2015, 9:42 pm

Shower in Units of gpc or USgpm in Form WEp1

CS-2009 WEp1:Water Use Reduction
posted by  Panagiota Dadinou  on 

Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt

1
Thu Jan 21, 2016, 2:46 pm

Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

Warehouse

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Anke Koch  on 

Dear LEED community, we are working on a project in Berlin, Germany.

2
Mon Aug 7, 2017, 1:28 am