Existing Building Flooring Reuse
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order t
No Facility Alterations
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Charalampos Giannikopoulos on
Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?
Gravel nonroof area
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Charalampos Giannikopoulos on
Under what circumstances could a nonroof area covered with light gravel be considered as non-hardscape?
Policy goals
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Charalampos Giannikopoulos on
Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
10 existing villas project
posted by Adamantia Zisopoulou on
My project is an existing sea resort complex which consists of 10 villas with kitchens. Which LEED rating system can I use?
Modeling Limitations to the Simulation Program
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Vasileios Kalfountzos on
I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For a project that is less than 150,000 ft2 and has 6 floors of which 1 (the basement) is unconditioned would System 6 still be eligible for the project and not System 8?
Greenguard
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Charalampos Giannikopoulos on
Would a product which is Greenguard gold certified automatically prove compliance with the credit requirements similarly to LEED for Schools?
Target Index
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Charalampos Giannikopoulos on
Further to a preliminary review of project located outside the U.S.