EA Prerequisite Minimum Energy Performance

EBOM-v4 EAp2:Minimum energy performance
posted by  Jordan Kirrane  on 

I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2.

1
Tue Mar 29, 2016, 4:00 pm

LEED v3 Campus Deadline

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.

1
Fri Nov 18, 2016, 5:20 pm

Retail Refrigeration

Retail-NC-v4 EAp4:Fundamental refrigerant management
posted by  Jason Smith  on 

I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal

1
Thu Mar 3, 2016, 8:48 pm

0% credit achievement rate?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Graham Langton  on 

I'm seeing the credit achievement rate as 0% for this credit. Other achievement rates seem OK. Has nobody achieved this credit? Can this be verified?

1
Fri Oct 10, 2014, 2:23 pm

Rainwater Harvesting for Toilet Flushing

NC-v4 WEp2:Indoor water use reduction
posted by  Patrice McVeigh  on 

Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?

1
Thu Jun 2, 2016, 7:24 am

Paired bus route service

NC-v4 LTc5:Access to quality transit
posted by  Patrice McVeigh  on 

Hi, Is it necessary for both stops to be within 400m of the site in order to satisfy the paired route requirements?

1
Thu May 5, 2016, 10:56 pm

Smoking Areas - Beside a Storage Room

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Patrice McVeigh  on 

Hi All, We are building a NC Campus Project that has a non smoking policy except in one designated outside area.

1
Thu Oct 29, 2015, 12:16 pm

Contaminated soil found during excavation.

CS-2009 SSc3:Brownfield Redevelopment
posted by  Martin Meehan  on 

The project involved the demolition of a existing building that had asbestos present on it.

1
Mon Feb 8, 2016, 5:28 pm

Ireland Climate Zone

CS-v4 EAp2:Minimum energy performance
posted by  James Duggan  on 

Hi all, Is Ireland Climate Zone 5A or 5C?

1
Thu Jul 20, 2017, 2:06 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.