CS-v4 EAp1:Fundamental commissioning and verificationposted by John Fingleton on
Hello, We are aiming to achieve all 6 credits under enhanced commissioning and we are aiming to submit the construction stage documentation upon completion of the project.
Ireland Climate Zone
NC-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi all, Could anyone clarify if Ireland is in climate zone 5A or 5C? Thanks in advance
Eurovent Certification
posted by Shane Geraghty on
Hi, I was wondering if anyone could direct me to information regarding AHU Eurovent certification requirements. Thank You
Paints or sealants applied before building is sealed
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patrice McVeigh on
Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?
Building Envelope Air infiltration
CS-v4 EAp2:Minimum energy performanceposted by Patrice McVeigh on
Hi All, I am trying to establish if a project can take benefit in the energy model for an improved air infiltration rate for the building envelope over the baseline model.
Suburban achieving SSc2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Martin Meehan on
The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed to do so?
Core and Shell project with public bike scheme adjacent
CS-v4 LTc5:Access to quality transitposted by Sean Hogan on
Our project seeking C&S certification for and existing building redevelopment.
"Box" within an exisiting Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Gina Dederer on
Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b
>75% M&V Template Requirement
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Dear all, Our project recently received the comment below which appears to require an Option B or D 'template' to be submitted with our plan if a tenant is to take 75% or more of the building spa
Lawn acceptance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Patrice McVeigh on
Hi, We have received comments on the lawn areas of our project which states “lawn is acceptable only if it a) is not a monoculture, b) does not require regular maintenance or mowing, and c) does n