Forum quick links
ETo calculation
NC-v4 WEp1:Outdoor water use reductionposted by Andrea Valentini on
Hi all,
I'm working on a project outside of the US, therefore I am using the international version of the WaterSense Water Budget Tool downloaded from the USGBC website.
Light Pollution Reduction credit threshold
NC-v4 SSc6:Light pollution reductionposted by Francesco Passerini on
Dear all,
Toilets: private or public?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In a office building that is occupied by a private firm how shall be considered the toilets according to Table 6.4 of ASHRAE 62.1-2010? Private, since the property is private? Does it depend on the
District plus heat pump
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
I have a building composed of two parts: a warehouse and an office.
System type for baseline in semiheated spaces
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
Hello,
District or not district?
NC-v4 EAp2:Minimum energy performanceposted by Ilaria Piong on
I have a building composed of two parts: a warehouse and an office.
exterior lighting: roof
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Hello, is exterior lighting on a roof (terrace) regulated by ASHRAE 90.1-2007? Or shall it be modelled in the same way (same power and same schedules) in the proposed and in the baseline mode
LEED v4 Outdoor Water Use Reduction Calculator
NC-v4 WEp1:Outdoor water use reductionposted by Clara Pistoni on
Hi All, does anyone try to use the spreadsheet updated on 4/5/2016? In the "Baseline Calculation" sheet, errors occur at anytime I tried to fill in a value under "Monthly Rainfall" or Monthly ET0".
Change a precertification with a certification process
posted by Sandro Paglia on
Goodmorning to all,
MBCx Plan as part of the Ongoing Cx Plan
NC-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Can the MBCx Plan be presented as a part of the Ongoing Cx Plan?