Forum quick links
SSC 4.2- Bicycle rack
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Giuseppina Amorusi on
Hi all, I need an information about the location of the bicycle rack. I’m working on a Core&shell shopping center, less than 300,000 square feet. The shopping center has more entrances at diff
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Water metering for Fire safety
Retail-NC-v4 WEc4:Water meteringposted by ilenia ottati on
Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.
Negative value of Monthly Landscape water requirement?
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Dear all, I am performing the calculation for the Water Outdoor Prerequisite, with both excel for a Project located in Italy (Rome): 1. Water budget tool (downloaded from EPA) 2.
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?
Existing building, physically sepatated from new construction
NC-2009 PIf2:Project Summary Detailsposted by FABIO VIERO on
We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.
Building Relocation
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nativa Architecture on
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).