Forum quick links
Transportation rate threshold between 45% and 50%
EBOM-v4 LTc1:Alternative transportationposted by Laura Danzig on
Hi all,
IEQ CREDIT 4.3
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Carlos Salas on
hola, en un ensayo de emisiones COV, ¿el formaldehido se debe tener en cuenta? Un suelo técnico formado con una madera encapsulada metalica, debe cumplir el test CPHD?
Gracias.
MRp2 & SSc2
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Laura Danzig on
Hi there.
I have a question regarding identifying the LEED project boundary as it relates to rainwater management.
Selling renewable energy
CI-v4 EAc4:Renewable energy productionposted by Borja Sánchez on
Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building.
NC-v4 SSc2 - Site development - protect or restore habitat
NC-v4 SSc2:Site development - protect or restore habitatposted by Mar Mulero on
Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a greenfield area or previously disturbed?
FSC x PFEC
NC-2009 MRc7:Certified Woodposted by Karyn Rodrigues on
I am working for a project in Barcelona which is pursuing LEEDv2009 certification.
Different outdoor air flow rates between Models
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
Hello, We hace just received the preliminary review comments for a Data Center.
Group or single project?
posted by David Lazaro on
Hello, We are pursuing LEED EBOM v2009 for an office complex. The project was built at the same time and has two twin buildings, with independent HVAC systems.