Forum quick links
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?
Managing rainwater in clay soil with low permeability
CS-v4 SSc4:Rainwater managementposted by Maria Glädt on
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).
Use High Priority Site as Innovation
CS-v4 LTc3:High priority siteposted by Sara Johansson on
Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.
Pilot credit wakable site
CS-v4 INc1:Innovationposted by Tobias Berge on
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.
Reuse of window glass for contstruction fill
CS-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We're involved in a Project where the Contractor wants to send the window glass to a facility that crushes the glass.
Option 2 - Leadership Extraction Practices - PEFC wood?
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
Is PEFC wood under Option 2 - Leadership Extraction Practices accepted?
Lighting Building Area method
CS-2009 EAp2:Minimum Energy Performanceposted by Pia Öhrling on
If the building is an office building with a small part retail and restaurant how should the areas be calculated for lighting when using the Building Area method?? The space usage types listed in P
Old sheet metal on roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Glädt on
Hi! The roof of our renovation project has is made of old sheet metal, which we do not know the SRI of.
Free waste heat
CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
PPA as renewable energy production?
CS-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.