Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

2-year contract from what time?

NC-2009 EAc6:Green power
posted by  Maria Porter  on 

I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?

1
Thu Nov 2, 2017, 12:39 pm

Managing rainwater in clay soil with low permeability

CS-v4 SSc4:Rainwater management
posted by  Maria Glädt  on 

Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Oct 24, 2017, 2:12 pm

Use High Priority Site as Innovation

CS-v4 LTc3:High priority site
posted by  Sara Johansson  on 

Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.

1
Wed Feb 5, 2020, 11:45 pm

Pilot credit wakable site

CS-v4 INc1:Innovation
posted by  Tobias Berge  on 

We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.

1
Sat Sep 9, 2017, 7:04 am

Old concrete

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Maria Glädt  on 

Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?

1
Wed May 20, 2015, 9:49 pm

EPDs used in CS project, can be accounted for in CI project?

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Sara Johansson  on 

If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification?

1
Mon Apr 10, 2017, 2:26 pm

Prefinished wood flooring: alternative to emissions testing?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Sue Clark  on 

We are specifying an FSC-certified wood floor that has a white pigmented wax finish.

0

Overnight apartments

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Sara Johansson  on 

Hi! My Project has space types office, apartments (with residents) and overnight apartments (rented by the office tenant for office guests).

1
Tue Dec 1, 2015, 10:19 pm

Visitors for residential units

NC-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

Hello, Where can I find info on regular and peak visitors for residentual units? App 2 does not give any information on residentual units.

1
Mon Nov 28, 2016, 7:55 pm

Bicycle Storage for residential part in mixed used building

CS-v4 LTc6:Bicycle facilities
posted by  Malti Gupta  on 

I'm working on mixed used LEED CS v4 project. we have Offices, retail & residential areas.

1
Sat Aug 26, 2017, 5:16 pm