Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

2-year contract from what time?

NC-2009 EAc6:Green power
posted by  Maria Porter  on 

I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?

1
Thu Nov 2, 2017, 12:39 pm

Managing rainwater in clay soil with low permeability

CS-v4 SSc4:Rainwater management
posted by  Maria Glädt  on 

Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Oct 24, 2017, 2:12 pm

Use High Priority Site as Innovation

CS-v4 LTc3:High priority site
posted by  Sara Johansson  on 

Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.

1
Wed Feb 5, 2020, 11:45 pm

Pilot credit wakable site

CS-v4 INc1:Innovation
posted by  Tobias Berge  on 

We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.

1
Sat Sep 9, 2017, 7:04 am

Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Maria Glädt  on 

See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.

1
Mon Aug 28, 2017, 2:22 pm

Energy model for a version 4 project in a version 2009 project

CS-2009 EAp2:Minimum Energy Performance
posted by  Mathilda Jonsson  on 

Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.

1
Tue Jan 26, 2016, 3:51 pm

Akvifer

NC-v4 EAc5:Renewable energy production
posted by  Sara Johansson  on 

Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.

1
Thu Nov 10, 2016, 4:51 pm

Typical TSS measures from Sedum roofing

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Andreas Soederberg  on 

We are planning to have Sedum Roofing, partly to recieve credit 6.1. I have read a lot about vegetated roofing also to pursue credit 6.2.

1
Fri Sep 26, 2014, 1:01 pm

Tricky project - NC, C&S or EBOM?

LEED Rating System Selection
posted by  Maria Glädt  on 

Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b

1
Fri Nov 27, 2015, 6:18 pm

Multi-attribute optimization

CS-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Tobias Berge  on 

Object - LEED v 4 Core & Shell. Sweden. Our goal is Platinum and we find the material credits very challenging.

1
Tue Jun 7, 2016, 1:41 pm