Forum quick links
Old sheet metal on roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Glädt on
Hi! The roof of our renovation project has is made of old sheet metal, which we do not know the SRI of.
Free waste heat
CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
PPA as renewable energy production?
CS-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
Aquifer for cooling
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Erik Nordlund on
I have a project where the project team are planning to partly cool the building using an aquifer.
Transients, visitors and peak visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).
ASHREA audit though newly renovated
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Mathilda Jonsson on
Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.
Separating waste - reuse at household
CI-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.
Increased ventilation instead of alarms?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maria Porter on
I understand that for densely occupied spaces an alarm (visible or audible) is required.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?