Lighting power allowance calculations for V4 ID+C Retail

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Joanna Peacock  on 

According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For

1
Wed Jan 18, 2017, 11:46 pm

Non-default shower use

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project.

1
Thu Sep 25, 2014, 8:35 pm

Water Use Reduction Calculator

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.

1
Fri Nov 27, 2015, 7:21 pm

FTE for campus or for building

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Karen Elliott  on 

We have a manufacturing campus and are assessing a new office block within that campus.

0

Process temperature controlled space

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Karen Elliott  on 

Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.

1
Sat Jan 7, 2017, 11:08 pm

EAp2 "USGBC approved equivalent"

NC-2009 EAp2:Minimum Energy Performance
posted by  Susannah Goddard  on 

I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.

1
Tue Sep 22, 2015, 5:40 pm

Toilets for customer use

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Karen Elliott  on 

We have a small retail unit with no toilet access for customers.

1
Wed Jan 18, 2017, 4:23 pm

IEQp1&c2 Documentation

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Jordan Kirrane  on 

Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.

0

Rug

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Alicia Costas Freire  on 

Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.

1
Mon Oct 24, 2016, 10:48 pm

Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am