Toilets for customer use
Retail-CI-v4 WEc1:Indoor water use reductionposted by Karen Elliott on
We have a small retail unit with no toilet access for customers.
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Rug
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou
Can this credit be achieved if no minimum local code requirement
CI-v4 LTc5:Reduced parking footprintposted by Juliana Moreira on
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!
Steel lockers BIFMA testing
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Anna Korinkova on
We have steel lockers on our project which shall be produced by a steel company and painted in the factory. They claim to use low VOC or zero VOC paints.
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be