Forum quick links
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
Service hot water pumps in the baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
I am doing an ASHRAE 90.1-2007 PRM analysis.
Help with LEED assessment from USGBC?
posted by Susannah Goddard on
I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.
Primer Sealer VOC Content
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jordan Kirrane on
I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.
Option 2 Prescriptive Compliance EU labels for appliances
CI-v4 EAp2:Minimum energy performanceposted by Karen Elliott on
I know others have asked this but I cannot find any definitive guidance on how to relate for example a dishwasher with an EU energy rating to the Energy Star label.
Understanding LEED Online V4?
posted by Susannah Goddard on
Hi, Wondered if anyone can point me in the direction of any useful guidance which helps explain what is what on the new LEED Online?
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
Lighting power allowance calculations for V4 ID+C Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Joanna Peacock on
According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For
Non-default shower use
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project.
Water Use Reduction Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.