Forum quick links
Forum
Topic
Replies
Recent
Lavetory Faucet default duration
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I have noticed a discrepency between the default duration shown within the LEED NC 2009 manual WEp1 table 2 and the default duration which auto populates for Private Lavatory Faucet on LEED Online
3
Tue Sep 29, 2015, 4:21 pm
LEED 2009 CI Preliminary Combined Review
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.
2
Thu Dec 18, 2014, 4:41 pm
Providing clarifications to Design Phase Review
LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susannah Goddard on
Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.
7
Thu Dec 4, 2014, 4:05 pm
LEED Design Review and Final Certification Proceedures
General forums
posted by Susannah Goddard on
We are currently working our way through our Design Stage Review comments from USGBC.
5
Thu Oct 2, 2014, 5:13 pm