Forum quick links
PI Form 2 Estimated project budget
NC-2009 PIf2:Project Summary Detailsposted by Brian Durgin on
Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.
Biorenewable paint
posted by Eric Linak on
Are there plans to give high credits to paints or adhesives that contain biorenewable content?
IEQc4.1 VOC content questions
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Christopher Baker on
I am preparing responses to a LEED review but have a couple questions on how to approach the VOC Content reporting for credit form IEQC4.1. The LEED online forms will allow me to enter VOC of 50 g
Built In Cabinetry - Custom Millwork
CI-v4 EQc2:Low emitting materialsposted by Summer Minchew on
Looking for some guidance on how to define built in cabinetry for LEED v4 Low-Emitting Materials.
Historic District vs Historic Building
NC-v4 MRc1:Building life-cycle impact reductionposted by Cynthia Kaplan on
Has anyone had success obtaining this credit with a building within an historic district?
Innovation Documentation Review
NC-v4 INc1:Innovationposted by Tracy Jordre on
I have some confusion surrounding review of the Innovation credits. While this is technically a "design credit", I understand that it can be submitted in any phase. Our team would like
Looking for voc limits for homes v4 interior stains
Homes-v4 EQc7:Low-emitting productsposted by Phil Vanderloo on
Can someone give me some guidance. My cabinet shop has finished my cabinets and are ready to send to the paint shop.
Do outdoor terraces require entrway systems?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Helene Lefkowitz on
Hello - I'm working on a commercial project that has an outdoor terrace on the second floor. Building occupants can use the terrace for outdoor seating and there will be a firepit.
Existing Canal
NC-v4 SSc4:Rainwater managementposted by Heather Appell on
Can this credit be achieved if some of the rainwater collection is filtered into a canal bordering the project site? TIA!