Energy modeling for Half a Floor
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So we are facing a new Commercial Interior project that only takes up approximately half of a floor. The problem we are facing is if we can conduct an energy model for half of floor. Th
Enhanced Commissioning - Envelope Commissioning
NC-v4 EAc1:Enhanced commissioningposted by Todd Bundren on
I am working on a new Cancer Center in St. Louis, MO. We are pursuing the envelope commissioning credits and have a question regarding the requirements:
TallyCAT for LEED submission?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Apoorva Pradhan on
LEED Documentation (MEPC) for Group Approach
NC-v4 EAp2:Minimum energy performanceposted by Apoorva Pradhan on
Hello,
UL Greenguard Gold
EBOM-v4.1 EQc1:Green Cleaningposted by Summer Minchew on
Do products that have UL Greenguard Gold certification meet the requirements for Products & Materials?
Plug Load Exemption
NC-2009 EAp2:Minimum Energy Performanceposted by Kim Lombard on
Has anyone ever gotten or heard about a plug load exemption for projects that demonstrate energy savings but due to extreme plug loads (over 60%) cannot meet the prerequisite 10%?
Calculator Protected sheet v4 1_Bldg products calculator_v04
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Hello LEED Experts,
Please help me with the v4.1 Calculator for (MR) Building products calculator. I am unable to make any changes or edits.
Sub-Metering for small service buildings
NC-v4 EAc3:Advanced energy meteringposted by Cyle Sheppard on
I have a question from our Electrical Engineer that I am unsure on.
Option 2 (prescriptive path) documentation?
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems
Option 1 Lighting Control - Undeveloped Future Tenant Spaces
NC-v4 EQc6:Interior lightingposted by James Keohane on
I am working on a project that has the majority of individual occupant spaces that will be completely finished with lighting controls meeting the requirements for Option 1. However, we a