Forum quick links
make up water for cooling tower
CI-v4 WEc1:Indoor water use reductionposted by Craig Flandermeyer on
Working on a Interiors project that has maximized efficiency in the flush and flow fixtures; proposing a rainwater harvesting tank to supplement/replace cooling tower make up water in order to gain
Regional Materials - Mode of transportation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Susan Di Giulio on
So, I think I know the answer to this (ie, "no"), but is there a multiplier one can apply to the 100 mile limit for less carbon intensive modes of transportation, like there was with V2009 (3x max
LEED for Schools and Low-Emitting Credit - Furniture Category
NC-v4 EQc2:Low emitting materialsposted by Kristin Purdy on
Our project is pursuing the Low-Emitting Materials Credit under LEED v4 for Schools. We have several questions on how to approach the furniture category under this credit.
Energy use baseline after renovation
EBOM-v4 EAp1:Energy efficient best management practicesposted by on
The following renovations were finished this month in an existing commercial building: 75 KW solar panel installation, replacement of roof with new high reflectance roof, interior and ex
Are Phenolic Formaldehyde resins OK?
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Brian Salazar on
Hello - I am working on a project where the subcontractor has requested we approved a product that uses a WBP Phenolic Formaldehyde binder.
Choosing LEED ND Plan vs Built Project
posted by Susan Di Giulio on
Where can I find more in-depth information about how to choose between these two versions of LEED-ND v4?
New V4 Project Boundary Overlaps Existing V2009 Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Doug Shilo on
An existing V2009 Project is getting an expansion that will fall under V4.
Rounding off the percentage to nearest whole number
NC-2009 MRc4:Recycled Contentposted by Vibha Pai on
I am working on the certification of a mixed use building and the recycled content used on the project is currently at 9.56%. Can it be rounded off to the nearest whole number a
Minimal Non-roof for LEED Major Renovation Project
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
The LEED project in question is currently under debate regarding sidewalk upgrade. Originally, the plan was to upgrade the sidewalk, but then that plan was trashed. Now it seems the sid
LCA: Fly Ash percentage (Tally)
NC-v4 MRc1:Building life-cycle impact reductionposted by Mary Couch on
Hello,