Forum quick links
Company specific LEED instruction
posted by Bobby White on
At the risk of being in the wrong section for this question, does anyone on the list know of an entity that can give specialized LEED instruction?
Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy D
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
There is a garage space that acts as an auto service bay (regularly occupied space) but has a high ceiling installed with high bay lighting fixtures. After weighing all other options, no othe
New Wood vs Recycled Wood
NC-2009 MRc4:Recycled Contentposted by Bobby White on
Hi. Trying to understand this: Our company uses MDF in our products which claims 97% recycled content (all pre-consumer).
Third Party Source vs. Portfolio Manager
NC-v4 EAp3:Building-level energy meteringposted by Edgar Arevalo on
So according to the LEED Online template for Building-level Energy and Water Metering, it states to pick either "USGBC-approved data template", which is Portfolio Manager, OR "Third-party data sour
Airport Terminal Project Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Kaarina Nehring on
Hi all,
Do kitchen make-up air fans require outdoor airflow monitoring devices? (For non-densely occupied spaces)
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jane Lane on
We have two KSFs serving two separate kitchen hoods.
Off-site PV farm financed by property owner
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Dricka Brown Thobois on
I am working with a property who is going for LEED EBOM recertification. The property is owned by a large business that has financed, owns, and maintains, a very large PV farm on the wes
Option 1: Smart-Phone Control
NC-v4 EQc6:Interior lightingposted by RDK E&S on
For option 1, is it acceptable for manual controls to be accomplished via a software interface rather than a physical switch?
Spaces that are not in scope
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I am currently working on an energy model for a major renovation project under LEED BD+C. There are two major spaces (both lunch rooms) that are not going to be served by the new HVAC sy
HC credit Places of Respite
NC-v4 INc1:Innovationposted by Emily Purcell on
Hi,
Wondering if anyone has had experience (successful or not) using this health care credit for an NC innovation point.