Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.
Uploading of Construction Credits
posted by Stephen Sgro on
We are currently under preliminary design review on a LEED 2009 Schools (split review) project. We received LEED prelim.
Number of points awarded for RP
NC-v4 RPc1:Regional priorityposted by Amrit Kaur on
How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?
Achievement Rates for Exemplary Performance
NC-2009 MRc2:Construction Waste Managementposted by Francis Hernández on
Does LEED User have the achievement rates for exemplary performance of credits? We are a GC and currently have been awarded a project with a goal of achieving exemplary performance in constru
Pre Fab Building Compliance
NC-v4 EQc2:Low emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?
Reapplying for credits
NC-2009 PIf2:Project Summary Detailsposted by jupiter luner on
We're getting ready to move onto construction phase.
Baseline Exterior Lighting Power Allowance
NC-2009 EAc1:Optimize Energy Performanceposted by Cory Duggin on
USGBC Addenda 100001062 updated the exterior lighting table for LEED v3 projects to the 90.1-2010 allowances. The addenda just says it updates credit SSc8 though.
Non roof measures
NC-v4 SSc5:Heat island reductionposted by Nithya Madan on
Is using mulch considered as a non roof measure under the heat island reduction category?
CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following: